A Kassem, M, Khoiry, M A and Hamzah, N (2020) Assessment of the effect of external risk factors on the success of an oil and gas construction project. Engineering, Construction and Architectural Management, 27(09), 2767–93.

Adabre, M A and Chan, A P (2020) Towards a sustainability assessment model for affordable housing projects: the perspective of professionals in Ghana. Engineering, Construction and Architectural Management, 27(09), 2523–51.

Ahmadu, H A, Ibrahim, A D, Ibrahim, Y M and Adogbo, K J (2020) Incorporating aleatory and epistemic uncertainties in the modelling of construction duration. Engineering, Construction and Architectural Management, 27(09), 2199–219.

Akanmu, A, Olayiwola, J and Olatunji, O A (2020) Musculoskeletal disorders within the carpentry trade: analysis of timber flooring subtasks. Engineering, Construction and Architectural Management, 27(09), 2577–90.

Almatroushi, H, Hariga, M, As'ad, R and Al-Bar, A (2020) The multi resource leveling and materials procurement problem: an integrated approach. Engineering, Construction and Architectural Management, 27(09), 2135–61.

Amos, D, Au-Yong, C P and Musa, Z N (2020) Developing key performance indicators for hospital facilities management services: a developing country perspective. Engineering, Construction and Architectural Management, 27(09), 2715–35.

Chiu, W Y B and Lai, J H (2020) Building information modelling for building services engineering: benefits, barriers and conducive measures. Engineering, Construction and Architectural Management, 27(09), 2221–52.

Edwards, D J, Rillie, I, Chileshe, N, Lai, J, Hosseini, M R and Thwala, W D (2020) A field survey of hand–arm vibration exposure in the UK utilities sector. Engineering, Construction and Architectural Management, 27(09), 2179–98.

Farajmandi, M, Ali, M, Hermann, R and AbouRizk, S (2020) A decision support tool for planning module installation in industrial construction. Engineering, Construction and Architectural Management, 27(09), 2615–41.

Hsu, P, Aurisicchio, M, Angeloudis, P and Whyte, J (2020) Understanding and visualizing schedule deviations in construction projects using fault tree analysis. Engineering, Construction and Architectural Management, 27(09), 2501–22.

Karamoozian, A and Wu, D (2020) A hybrid risk prioritization approach in construction projects using failure mode and effective analysis. Engineering, Construction and Architectural Management, 27(09), 2661–86.

Liu, H, Song, J and Wang, G (2020) Development of a tool for measuring building information modeling (BIM) user satisfaction – method selection, scale development and case study. Engineering, Construction and Architectural Management, 27(09), 2409–27.

Liu, J, Cui, Z, Feng, Y, Perera, S and Han, J (2020) Impact of culture differences on performance of international construction joint ventures: the moderating role of conflict management. Engineering, Construction and Architectural Management, 27(09), 2353–77.

Luo, L, Zhang, L and He, Q (2020) Linking project complexity to project success: a hybrid SEM–FCM method. Engineering, Construction and Architectural Management, 27(09), 2591–614.

Ma, L and Fu, H (2020) Exploring the influence of project complexity on the mega construction project success: a qualitative comparative analysis (QCA) method. Engineering, Construction and Architectural Management, 27(09), 2429–49.

Maqsoom, A, Hamad, M, Ashraf, H, Thaheem, M J and Umer, M (2020) Managerial control mechanisms and their influence on project performance: an investigation of the moderating role of complexity risk. Engineering, Construction and Architectural Management, 27(09), 2451–75.

Moon, S, Ham, N, Kim, S, Hou, L, Kim, J and Kim, J (2020) Fourth industrialization-oriented offsite construction: case study of an application to an irregular commercial building. Engineering, Construction and Architectural Management, 27(09), 2271–86.

  • Type: Journal Article
  • Keywords: Construction; Industry 4.0; Construction; Autonomous system;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-07-2018-0312
  • Abstract:
    This study, a research project, aims to examine the distinct characteristics of the Fourth Industrial Revolution (4IR), with a focus on construction. Following this examination, the paper presents a field study to evaluate the impact of the 4IR on the construction process.Design/methodology/approach The first half of this project is dedicated to defining the 4IR by reviewing existing literature. The other half of the project presents a case study to demonstrate the concept of the 4IR and measure the effect of its application. To validate the defined concept of the 4IR, the study focuses on the following: autonomous system for producing drawings and robotics in construction.Findings The intensive literature review revealed three unequivocal features of the 4IR: defined tasks, undefined tasks and improvement possibilities. The following case study showed that the incorporation of the three 4IR features resulted in improved productivity and efficiency during the construction of the podium for the Lotte World Tower. For example, the macro-based autonomous system achieved 5.52 shop drawings per hour, highlighting the potential impact of independent, autonomous machinery.Originality/value The originality of this project stems from its attempt to quantify the effectiveness of applying autonomous technologies to a practical project. While previous works in this field have focused on system development and improvement, this paper presents an autonomous system at work in an actual project, in which junior engineers were able to be entirely replaced. The system was successful in independently creating numerous required shop drawings. The value of this analysis is to generate scientific evidence to evaluate the efficacy of the adoption of 4IR-oriented technologies.

Nasirzadeh, F, Kabir, H D, Akbari, M, Khosravi, A, Nahavandi, S and Carmichael, D G (2020) ANN-based prediction intervals to forecast labour productivity. Engineering, Construction and Architectural Management, 27(09), 2335–51.

Sezegen, A and Edis, E (2020) Product innovation types: a discussion considering building facade products. Engineering, Construction and Architectural Management, 27(09), 2379–408.

Sinoh, S S, Othman, F and Ibrahim, Z (2020) Critical success factors for BIM implementation: a Malaysian case study. Engineering, Construction and Architectural Management, 27(09), 2737–65.

Tran, D H (2020) Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods. Engineering, Construction and Architectural Management, 27(09), 2287–313.

Tran, D Q, Harper, C M, Smadi, A M and Mohamed, M (2020) Staffing needs and utilization for alternative contracting methods in highway design and construction. Engineering, Construction and Architectural Management, 27(09), 2163–78.

Viswanathan, S K and Jha, K N (2020) Risk mitigation modelling of international construction projects executed by Indian firms: a structural equation modelling approach. Engineering, Construction and Architectural Management, 27(09), 2687–713.

Wang, P, Wu, P, Wang, X, Chen, X and Zhou, T (2020) Developing optimal scaffolding erection through the integration of lean and work posture analysis. Engineering, Construction and Architectural Management, 27(09), 2109–33.

Wu, J, Liu, H J, Sing, M C, Humphrey, R and Zhao, J (2020) Public–private partnerships: implications from policy changes for practice in managing risks. Engineering, Construction and Architectural Management, 27(09), 2253–69.

Wuni, I Y and Shen, G Q (2020) Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycle. Engineering, Construction and Architectural Management, 27(09), 2315–33.

Zhang, H and Yu, L (2020) Dynamic transportation planning for prefabricated component supply chain. Engineering, Construction and Architectural Management, 27(09), 2553–76.

Zhang, H, Yu, L and Zhang, W (2020) Dynamic performance incentive model with supervision mechanism for PPP projects. Engineering, Construction and Architectural Management, 27(09), 2643–59.

Zhang, S B, Chen, J and Fu, Y (2020) Contract complexity and trust in construction project subcontracting. Engineering, Construction and Architectural Management, 27(09), 2477–500.